Armistead Earthmoving

2011/2012

Principal - Barwon Water Alliance
Contract type - Lump Sum Contract
Value  - $1.5m approx

Description

The reclamation plant consists of two primary lagoons (each 6ML), two secondary lagoons (each 1.8ML), and a 40ML winter storage lagoon.

Works involved clearing the former plantation site, stripping topsoil, bulk excavation to 1m bellow subgrade level (approx 100,000m3) placement of 600mm clay liner to AS3798 (2007), supply and place Geofabric and 300mm rock beaching, associated pipe work and pit structures, topsoiling, grass establishment and security fencing.

Earthmoving :: Roads :: Heavy Equipment :: Clearing :: Heavy Transport :: Civil Contracting

 

Site-map